Cleaning up petroleum contamination in soil and groundwater is pretty straightforward. It is usually accomplished by one or more tried-and-proven methods that rely on inserting PVC pipe into the contamination zone for treatment. But multiple efforts outside the sprawling Building 5 hangar complex on West Tower Avenue at Alameda Point failed to reduce contamination to regulatory goals. In August 2020, after almost two decades of investigation and treatment efforts, the Navy resorted to a rarely used option of digging up all of the soil down to the water table and hauling most of it away.
Building 5 was the location of the Navy’s plane refurbishing and overhaul facility where thousands of civilians worked. It was known as the Naval Air Rework Facility. Before an airplane was moved into the hangar, it underwent de-fueling, flushing out fuel lines and cleaning various components with products akin to paint thinner. This preparatory work was the source of the contamination in the soil and groundwater near the big hangar doors. Continue reading “Navy digs up petroleum contamination in rare cleanup action”

