Soil cover being installed at future park site

The Navy made significant headway in June and July on its third and final environmental remediation soil-cover project on the Alameda Point airfield, with 7,289 truckloads of soil being hauled in from an East Bay Municipal Utility District soil-storage site in Castro Valley.  The frenzy of truck traffic through the Tube and down Main Street led to complaints of speeding trucks and running red lights, prompting the Navy to warn truck drivers that they could be removed from the job for violating traffic laws, and the City of Alameda Police Department to step up traffic enforcement.

A temporary mountain of approximately 200,000 cubic yards of stockpiled soil is visible on the western end of the airfield during a ferry ride to San Francisco from the Main Street Ferry Terminal.  Another 100,000 cubic yards of cover soil and 60,000 cubic yards of top soil for new vegetation is expected to be delivered by November.  The soil will be used to create a three-foot cover over the 60-acre cleanup site by the end of 2020. Continue reading “Soil cover being installed at future park site”