The Navy will implement the environmental remediation plan for Site 32 on the western end of the former airfield. The plan calls for covering the entire 60-acre site with three free of clean soil without raising the elevation of the existing wetlands. Thus, the existing wetlands will be excavated to a depth of three feet, and then three feet of replacement clean soil will be brought in to re-contour the wetlands.
Most of the water in the accompanying photos, taken in March 2019, is from rainwater. However, this wetland is also low enough in elevation that it receives water via tidal pressure from the Bay. Continue reading “Views of wetland cleanup area to be dug up, upgraded in 2019”



