
Cleanup at Alameda Point continues to unfold. Every month the Restoration Advisory Board meets to stay apprised of the happenings and offer comments. The public is invited to attend on the first Thursday of the month, 6:30 p.m. at the rear of City Hall West at Alameda Point. Here are some highlights from the February meeting and a “Point Being” video update on the Seaplane Lagoon.

Site 1 – Burn Area Larger Than Expected
There’s a glitch in the ditch at Site 1 out at the northwestern tip, in the Northwest Territories. This is one of two of the Navy’s industrial dumps (aka disposal sites – the other one being Site 2 to the south on the Wildlife Refuge), and plans were on the calendar to begin the remediation plan on the 30-acre Site 1, which is set to become recreational open space, this year. But instead of 2013, it will now be 2015 before we are throwing Frisbees, riding the Bay Trail, or launching kayaks on the windy, incomparable western shore.
The plan was, and still is, to install a four-foot engineered soil cap on top of the site, after digging out and hauling away refuse from the burn area, where things like railroad ties were burned, which makes up a small part of the site. But as the Navy contractor was doing prep work for a detailed work plan, they discovered that the old burn area is larger than expected and that soil under the burn area “exceeded remediation goals,” which at the very least means more testing to find out what else is there.