Demolition Underway at Alameda Point

Developer finding ways to recycle material

The heavy equipment was already demolishing buildings and pavement as the ceremonial groundbreaking took place on May 23.  Workers had already leveled many of the structures.  They had already begun separating the remains into distinct piles of concrete, asphalt, structural steel, sheet metal and rebar for recycling.

“Everything that can be recycled is being recycled,” said Joe Ernst, president of srmErnst, one of the Alameda Point Partners group busy at Site A.  “In our bidding we pushed for everything to be separated and recycled, with the value of recycled material offsetting demo cost.  All of the ground-up asphalt and concrete will remain onsite and be used under streets and any exterior concrete structures and surfaces.” Continue reading “Demolition Underway at Alameda Point”