Frequently Asked Questions

What is happening with the airfield area?

In practical terms, very little.

A large part is owned by the U.S. Department of Veterans Affairs (VA). 

The remaining part where the monthly Antiques Faire is held is partially owned by the City.

The rest of the land along the Oakland Estuary is owned by Navy, which still has environmental remediation work to complete.  When the environmental remediation work is completed, the land will be transferred to the City, which has an agreement with the East Bay Regional Park District to lease the land to the district for a regional park.

The U.S. Department of Veterans Affairs (VA) received a large part of the airfield in 2014 to build a medical clinic and columbarium cemetery on a small part of the land.  Despite receiving almost $400 million in appropriations from Congress during the years that followed, the project never started.  In August 2025, the VA informed Congress that it was cancelling the project and was going to dispose of the property.  Wildlife advocates hope the new owner will be a conservation agency to manage the area as a wildlife reserve and open the Bay Trail around the perimeter.

Currently the VA contracts with the U.S. Fish & Wildlife Service to manage a colony of endangered California least terns that nest on a 10-acre site on the property from April to mid-August.

On March 19, 2013, the Alameda City Council adopted a resolution affirming its continued support for wildlife conservation on the VA’s undeveloped area, which was originally planned for a wildlife refuge, and zoned it “Nature Reserve.”

What is the current planning process for Alameda Point?

The city launched its current planning effort in February 2013. The planning effort included the preparation and adoption of the following:

  • Final Environmental Impact Report
  • Master Infrastructure Plan
  • Town Center and Waterfront Plan
  • New Zoning Map

These documents were completed and approved in February of 2014. Subsequently, the city approved the Alameda Point Waterfront and Town Center Specific Plan for the area around the Seaplane Lagoon.

The city is selling some property parcel by parcel and others in blocks. The project for 800 housing units (later expanded by 600 units) at Site A is partially completed.  The West Midway residential project began preparing the land at Main Street and West Tower Avenue in 2026 for construction of 284 mostly market rate units.

What is the Community Reuse Plan for Alameda Point?

The Naval Air Station-Alameda Community Reuse Plan was adopted in 1996 as a guiding document for the conversion of the Navy base to civilian use. It is the guiding document for the No-cost Economic Development Conveyance of land from the Navy to Alameda that began in 2014.

The objectives outlined in the Community Reuse Plan are:
• Seamlessly integrate Alameda Point with the rest of the city
• Foster a vibrant new neighborhood
• Maximize waterfront accessibility
• De-emphasize the automobile and make new development compatible with transportation capacity
• Ensure economic development
• Create a mixed-use environment
• Establish neighborhood centers

When will the Navy environmental cleanup be completed?

The vast majority of cleanup sites have been satisfactorily remediated and transferred out of Navy ownership to the City of Alameda and the U.S. Department of Veterans Affairs.  Sites with remaining issues are the following:

Building 5 – This 900,000-square-foot hangar complex facing West Tower Avenue and Monarch Street has only a few dozen square feet of interior floor surfaces where radium-226 needs to be removed.  It is expected that the Navy will complete this work in 2027, and thereafter the state Department of Toxic Substances Control will sign off on releasing the building for unrestricted use and conveyance to the City of Alameda.

Various sites with PFAS (per- and polyfluoroalkyl substances) “forever chemicals” – The  U.S. Environmental Protection Agency only recently changed the classification of these chemicals from “pollutant” to “hazardous.”  Only hazardous chemicals require cleanup under the Superfund law.  Since all of the cleanup decisions had already been approved and signed, the Navy has had to re-visit all of the sites and determine which ones require remediation for PFAS.  A comprehensive PFAS remediation decision could be issued in 2027.

The most prominent PFAS contamination site is the former Firefighter Training Area next to the Oakland Estuary not far from where the Antiques Faire is held.  A successful remediation method using liquified carbon is in place.  Whether this method will be employed at other sites is to be determined.

Two prominent commercial buildings, Building 41 and Building 400, are still owned by the Navy until the final comprehensive decision is issued. 

Jet monument area – From the jet monument to the ferry parking lot there is groundwater contamination from an industrial cleaning solvent.  In 2026, the Navy completed its sixth round of injections of a vegetable-oil-enhanced solution to support bacteria that degrades the solvent.  The method is called bioremediation.  It’s slow but effective.  With each injection event, the Navy gets closer to achieving a goal that would allow for commercial use, which means the land could then be transferred to the City.

Site 32 – Area along the Oakland Estuary near the location of the Antiques Faire is awaiting a workplan to put a three-foot-thick soil cover over 60-acres.  Only incidental items containing radium-226 have been identified and removed.  The problem is simply that radiological scanners are only effective to a depth of one foot, and regulations require a permanent barrier of at least three feet between the surface and any potential items that may be buried.  Enough soil was imported by truck seven years ago, but disagreements over a workplan meant the site has been in limbo.  Once the work is completed, the area will become part of a regional park.

Can a new bridge or tunnel be built from Alameda to Oakland?

A new bridge is not feasible due to the height required by the Port of Oakland. A drawbridge is unlikely, as it would interfere with the rapid response requirement of the Coast Guard ships located at Coast Guard Island.

In theory, a new tunnel could be built, but no feasibility studies have been performed since the closure of the base.  The 1996 Community Reuse Plan contemplated a new bridge or tunnel with a map notation saying, “Alignment of new bridge/tunnel to be determined.” 

How can I found out about leasing space at Alameda Point?

Commercial leasing inquiries should be directed to the City’s commercial real estate brokerage firm, Jones Lang LaSalle (JLL) by contacting either of: